|

|
SCHEDULE
OF RATES
MERRIMACK VILLAGE DISTRICT
Rates
Effective July 1, 2007 |
|
| |
|
|
|
|
|
TABLE
OF CONTENTS
(click on heading)
|
|
| BOARD OF COMMISSIONERS |
| James
O'Neil,
Chairman |
| |
Lon
Woods, Vice Chairman |
Thomas
Nutting |
|
| |
George Keller |
Anthony Pellegrino |
|
|
“Schedule of Rates” proposal
to be considered for adoption by the Merrimack Village
District Board of Commissioners on June 20, 2005 after a duly noticed
public hearing on June 20, 2005 at 7:00 PM.
1. Revised by the Board of Commissioners on November 21, 2005,
effective January 1, 2006.
2. Revised by the Board of Commissioners on June 18, 2007 effective
July 1, 2007.
|
|
MVD WATER RATES
There is a growing recognition in the United States and elsewhere that
the condition of our vital water infrastructure needs serious attention in
many places. The pipes, pumps, and treatment facilities that are critical
to delivering a clean, adequate supply of potable water to our communities
are central to our quality of life, the protection of public health and safety,
and a thriving economy. The burden of paying for construction, operation
and maintenance of these facilities falls mainly on customers
of the systems, and those costs are rising dramatically in some areas.*
- People undervalue water. This sometimes compounds the challenge of getting
rate increases accepted.
- It’s never too late to start doing the right thing. I.e., structuring
rates to insure sufficient income to support current operational and future
needs of the MVD. The Board of Commissioners avoids “rate management
by crisis”. We need to think “long term” and plan beyond
any current deficiencies.
- We addressed this
issue by completing (February 2007) an outside independent rate study
for water consumption/usage charges that reviewed our current and future
operation expenses as well as the MVD’s capital needs
over the next several years.
- The BOC will be considering
adjusting rates to better reflect the amount necessary to
support the 2007-2008 and future budgets. Our cost to maintain an ongoing
service to the public is ever increasing. Electricity, chemicals, capital
improvements, labor, fuel, as well as other costs continue to increase.
The Board of Commissioners will work to estaTBD by BOCblish modest increases
to better reflect the MVD’s cost of providing services.
FYI
Consumption
Average Per Capita/Per Day
Winter – 170
gpcd*
Spring – 225 gpcd*
Summer – 325 gpcd*
(MVD average/day - 219 gpd year round)
“The
harder the conflict, the more glorious the triumph.
What we obtain too cheaply, we esteem too lightly; it is the
dearness only that gives everything it’s
value.”
-Thomas
Paine |
*AWWA – New England
Water Works Newsletter, Fall 2004
top of page |
| Description of Service |
Current Cost |
Adjusted Cost - 7/1/07 |
| |
|
|
|
|
| Water Consumption/Usage Charge |
$1.55/100 Cubic Ft. |
|
$1.65/100
Cubic Ft. |
|
| |
|
|
|
|
| Security
Deposits* (all classifications) |
One
Time Charge |
|
One
Time Charge |
|
| Up to 5/8" |
$35.00 |
|
DISCONTINUED |
|
| 1" |
$60.00 |
|
|
|
| 1-1/2" |
$110.00 |
|
|
|
| 2" |
$210.00 |
|
|
|
| 3" |
$335.00 |
|
|
|
| 4" |
$460.00 |
|
|
|
| 6" |
$660.00 |
|
|
|
| 8" |
$860.00 |
|
|
|
| 10" |
$1,050.00 |
|
|
|
| 12" |
$1,250.00 |
|
|
|
| *applied
as credit to account after two (2) years.
|
| top
of page |
| Transfer Fee |
One Time
Charge |
|
One Time
Charge |
|
| Domestic |
n/a |
|
$35.00 |
|
| Mercantile |
n/a |
|
$45.00 |
|
| Commercial |
n/a |
|
$55.00 |
|
| |
|
|
|
|
| Meter Charges |
Quarterly |
Yearly |
Quarterly |
Yearly |
| Up to 5/8" |
$10.96 |
$43.84 |
$11.50 |
$46.00 |
| 1" |
$19.53 |
$78.12 |
$20.50 |
$82.00 |
| 1-1/2" |
$30.25 |
$121.00 |
$31.75 |
$127.00 |
| 2" |
$44.80 |
$179.20 |
$47.00 |
$188.00 |
| 3" |
$67.62 |
$270.48 |
$71.00 |
$284.00 |
| 4" |
$105.00 |
$420.00 |
$110.25 |
$441.00 |
| 6" |
$196.41 |
$785.64 |
$206.00 |
$824.00 |
| 8" |
$305.00 |
$1,220.00 |
$320.00 |
$1,280.00 |
| 10" |
$430.00 |
$1,720.00 |
$451.25 |
$1,805.00 |
| 12" |
$765.00 |
$3,060.00 |
$802.72 |
$3,211.00 |
| |
|
|
|
|
| Fire/Hydrant Charges* |
Quarterly |
Yearly |
Quarterly |
Yearly |
| Domestic/Condos |
$11.25 |
$45.00 |
$14.00 |
$56.00 |
| Mercantile |
$25.00 |
$100.00 |
$28.00 |
$112.00 |
| Industrial |
$60.00 |
$240.00 |
$70.00 |
$280.00 |
1 The
Board of Commissioners (BOC) action in regular session
on January 31, 2005 passed the following motion: …"that
the BOC
approve charging all condominium units in the Town
of Merrimack on Merrimack Village District
water a residential hydrant charge of $11.25 per
quarter or $45.00 per year. The sprinkler demand
fee is based
on the size of water line metering the condominium
building and will be charged to the condominium association.
Both the "hydrant charge" and the "sprinkler
demand fee" charges will be based on the rates that may be
set by the Merrimack Village District Board of Commissioners."
top
of page
|
| Sprinkler Entrance Demand Charges |
Quarterly |
Yearly |
Quarterly |
Yearly |
| 2" |
$32.46 |
$129.84 |
$40.25 |
$161.00 |
| 4" |
$64.96 |
$259.84 |
$80.50 |
$322.00 |
| 6" |
$146.07 |
$584.28 |
$181.00 |
$724.00 |
| 8" |
$259.68 |
$1,038.72 |
$322.00 |
$1,288.00 |
| 10" |
$450.00 |
$1,800.00 |
$558.00 |
$2,232.00
|
| 12" |
$584.28 |
$2,337.12 |
$724.50 |
$2,898.00 |
| Description of Service |
Current
Cost |
District
Installs Adjusted Cost - 7/1/07 |
Current
Cost Contractor Installs with MVD Approval |
Contractor
Installs with MVD Approval - 7/1/07 |
| Entrance
Application New Water Service (all classifications) |
One Time Charge |
One
Time Charge |
One Time Charge |
One
Time Charge |
| 3/4" service
with a 5/8" meter 1 |
$850.00 |
AS
IS |
$450.00 |
|
| 1" service
with a 1" meter 1 |
$1,050.00 |
AS
IS |
$550.00 |
|
| 2" service
with a 2" meter 2 |
$1,500.00 |
AS
IS |
$750.00 |
$820.00 |
| 3" service
with a 3" meter 2 |
$2,000.00 |
AS
IS |
$1,000.00 |
$1,070.00 |
| 4" service
with a 4 " meter 2 |
$2,500.00 |
AS
IS |
$1,250.00 |
$1,320.00 |
| 6" service
with a 6 " meter 2 |
$3,000.00 |
AS
IS |
$1,500.00 |
$1,570.00 |
| 8" service
with a 8" meter 2 |
$4,000.00 |
AS
IS |
$2,000.00 |
$2,070.00 |
| 10" service
with a 10" meter 2 |
$5,000.00 |
AS
IS |
$2,500.00 |
$2,570.00 |
| 12" service
with a 12" meter 2 |
$6,000.00 |
AS
IS |
$3,000.00 |
$3,070.00 |
1 This
fee includes all fittings to connect and tap into our
mainline up to the first shut-off valve/curb stop. This
fee will also provide you with a meter horn, meter
and installation of the meter by the Merrimack Village
District.
2 The cost of meters and installation
in excess of one (1) inch will be borne by
the applicant/user. Final approval of the Installation
is subject to inspection
by MVD prior to water service turn on. An inspection fee
during regular business hours (minimum 1 hour) is included
in the entrance fee. For after hours inspections and
any additional charges after one (1) hours see Service
Charges. |
| Description
of Service |
Current
Cost |
District
Installs Adjusted Cost - 7/1/07 |
Current
Cost Contractor Installs with MVD Approval |
Contractor
Installs with MVD Approval - 7/1/07 |
| Entrance
Application New Fire 3 Sprinkler Service (all
classifications) |
One Time Charge |
One
Time Charge |
One Time Charge |
One
Time Charge |
| 1" service
with a 1" meter 3 |
$1,000.00 |
AS
IS |
$500.00 |
|
| 2" service
with a 2 " meter 4 |
$1,500.00 |
AS
IS |
$750.00 |
$820.00 |
| 3" service
with a 3 " meter 4 |
$2,000.00 |
AS
IS |
$1,000.00 |
$1,070.00 |
| 4" service
with a 4 " meter 4 |
$2,500.00 |
AS
IS |
$1,250.00 |
$1,320.00 |
| 6" service
with a 6 " meter 4 |
$3,000.00 |
AS
IS |
$1,500.00 |
$1,570.00 |
| 8" service
with a 8 " meter 4 |
$4,000.00 |
AS
IS |
$2,000.00 |
$2,070.00 |
| 10" service
with a 10" meter 4 |
$5,000.00 |
AS
IS |
$2,500.00 |
$2,570.00 |
| 12" service
with a 12" meter 4 |
$6,000.00 |
AS
IS |
$3,000.00 |
$3,070.00 |
3 This
fee includes all fittings to connect and tap into our
mainline up to the first shut-off valve/curb stop. This
fee will also provide you with a meter horn, meter and
installation of the meter by the Merrimack Village District.
4 The cost of meters and installation in excess of one
(1) inch will be borne by the applicant/user. Final
approval of the installation is subject to inspection
by the Merrimack Village District prior to water
service turn on. An inspection fee during regular
business hours (minimum 1
hour) is included in the entrance fee. For after hours
inspections and any additional charges after one
(1) hour see Service Charges.
|
|
| SERVICE
CHARGES |
| Description of Service |
Current Cost |
Adjusted Cost - 7/107 |
| Labor per employee |
$65.00/hr. |
$70.00/hr. |
| Labor Overtime per employee |
$97.50/hr. |
$105.00/hr. |
| |
|
|
| Backflow Testing |
$45.00/test |
$50.00/test |
| Meter Calibration
Test (Non-Defective) |
$65.00/hr. |
$70.00/hr. |
| Locating
Leaks, customer owned service (external) |
$65.00/hr. |
$70.00/hr. |
| Underground
Water Service Locating (Non-Emergency, Customer Request) |
$0.00 |
$0.00 |
| Pressure
Test - First Visit Only |
$0.00 |
$0.00 |
| Pressure
Test - Repeated Visit (1 hour minimum) |
$65.00/hr. |
$70.00/hr. |
| Customer
Requested Bacteria Testing (water tests clean) |
|
|
| If
water tests clean, customer charged |
$65.00/hr. |
$70.00/hr. |
| If
water tests not clean, MVD covers cost |
|
|
| Fire Flows
(requested) (1 hour minimum) |
|
$70.00/hr. |
| |
|
|
| Hydrant Hookup and Pool Filling |
$32.50/visit |
$35.00/visit |
| Meter Charge for Pool Filling |
$25.00/day |
$30.00/day |
| Hose Charge for Pool Filling |
$5.00/100 ft./day |
$6.00/100
ft./day |
| Water Inspection
In-Home Leak Detection (No leak found, no charge) |
$65.00/hr. |
$70.00/hr. |
| Installation
of Meters & Associated Equipment (new entrances only) |
"$0.00"2 |
"$0.00"2 |
| Each
additional visit |
n/a |
$70.00/hr. |
| Replace Damaged
or Missing Water Meter (repair parts extra) |
$65.00/hr. |
$70.00/hr. |
| Repair/replace
damaged water meter (caused by freezing, abuse, etc.)
(parts extra) |
$65.00/hr. |
$70.00/hr. |
| Thawing Frozen
Water Service (equipment + 2 employees @ 1 hr. minimum) |
$65.00/hr. |
$200.00/hr. |
| Thawing Frozen
Water Service after hours (equipment + 2 employees @
2 hr. minimum) |
|
$460.00/hr. |
| |
|
|
| Water On/Off for Delinquent Customers (M - F, 7:30AM - 3:30 PM) |
$32.50/visit |
$35.00/visit |
| Return Service
(M - F 3:30PM - 7:30AM)1 |
$195.001 |
$210.001 |
| Requested Water Turn On/Off (M-F 7:30AM - 3:30PM) Repairs, etc. |
$65.00/hr. |
$70.00/hr. |
| Requested Water Turn On/Off (M-F 3:30PM - 7:30AM)* Repairs, etc. |
$195.001 |
$210.001 |
| Requested Water Turn On/Off (Saturday, Sunday and Holidays)* |
$195.001 |
$210.001 |
| |
|
|
| 1 Reflects a minimum 2 hour charge for After Hours, Saturday, Sunday
and Holidays. |
| 2 Included in Entrance Application New Water Service Fee
for 5/8" and 1" only. (See Entrance Applications) |
| NOTE:
Some services will require more than one employee. Each
employee will be charged out at the stipulated rates
above. |
| |
|
top
of page |
|
| MISCELLANEOUS
CHARGES |
| Description
of Service |
Current
Cost |
Adjusted
Cost 7/1/07 |
| Hydrants 1 |
$900.00* |
$1,480.72 |
| Tampering with
MVD Equipment |
$250.00 |
AS
IS |
| Violating MVD
Outside Water Ban(Reconnection Fee) 2 |
$125.00 |
AS
IS |
Subsequent violation
fee doubles each time (i.e. $250, $500, $1,000,
etc.)
|
|
|
| Carrying charge
on 30-day past due invoices |
1.5%
of total |
AS
IS |
Minimum carrying
charge
|
$5.00 |
AS
IS |
| Requested Relocation
of Water Line by Town of Merrimack 3 |
MVD
pays first $1,000 |
AS
IS |
| Purveyor of water
sales outside the Village District boundaries meter
charges |
|
|
3" meter
|
n/a |
$107.07/mo. |
4" meter
|
n/a |
$176.58/mo. |
| Purveyor of water
for Resale (Pool Fill-ups, etc.) |
$1.55/100
cu. ft. |
$2.50/100
cu. ft.
|
| Check Return Fee
(per RSA 80:56) |
n/a |
$25.00
+ MVD Cost |
| Use of Credit
Cards (per RSA 80:52-C) 4 |
|
.30/transaction
+ 1.5% of total bill |
| Requested Final
Reading and Bill Preparation |
$25.00 |
AS
IS |
| |
|
|
1 To be adjusted by market price.
2 Adopted
by March 25, 2003 Annual Meeting By-Law.
3 See Town
of Merrimack Ordinance-Adopted at Town Meeting on March 10, 1998.
4 Adopted
by March 27, 2007 Annual Meeting By-Law in accordance
with RSA 80:52-C.
top
of page |
|
| CONSTRUCTIONS
CHARGES |
| Description
of Service |
Current
Cost |
Adjusted
Cost - 7/1/07 |
| Backhoe and Operator |
$125.00/hr. |
$135.00/hr. |
| Backhoe and Operator
- Overtime |
$157.50/hr. |
$165.00/hr. |
| 2-1/2 Ton Truck
and Operator |
$105.00/hr. |
$115.00/hr. |
| 2-1/2 Ton Truck
and Operator - Overtime |
$137.50/hr. |
$150.00/hr. |
| Hole Hogger |
$65.00/hr. |
$70.00/hr. |
| Mainline Extension
Costs |
|
|
- Application
for Mainline Extension Surcharge (Contractor
performs work) 1
|
|
$6.20/ft. |
- Application
for Mainline Extension Cost/Ft. (MVD performs work)
2
|
|
$20.60/ft. |
| Plan Review |
|
|
- All developments,
etc. requesting water service 3
|
$65.00/hr. |
$70.00/hr. |
- All developments,
etc. within the Wellhead Protection areas of the
Aquifer Conservation District 3
|
$65.00/hr. |
$70.00/hr. |
| Deposit for Record
Drawings (As-Builts) (refunded after Record Drawings
received and approved). |
|
|
- Line extension
up to 1000' or 10 units
|
|
$4,000.00 |
- Line extension
of 1001' - 3000' or 11-30 units
|
|
$6,000.00 |
- Line extension
of 3001' - 5000' or 31-50 units
|
|
$8,000.00 |
- Line extension
beyond 5000' or 50 units -
|
TBD
by BOC |
| NOTE:
No water service provided until final, accurate record drawings furnished
and accepted by the MVD. Deposit will be returned assuming all other
fees and charges paid. Otherwise deposit will be applied to any outstanding
balance. |
1 This
surcharge will assist the District in future maintenance of
the installed line. Upon proper installation and
acceptance by the District the line(s) "...shall
by the property of the District.". This charge
can be changed by the Board of Commissioners
by action of the March 25, 2005 Annual Meeting.
2 See
MVD By-Law "7.C. Extensions to the Present Water Main
System". There will be an additional cost
for fittings, engineering, frost, ledge,
replacing of paving, abnormal natural barriers,
bridging of water and the like." Upon proper
installation and acceptance by the District
the line(s) "... shall be the property of
the District."). This charge can be changed
by the Board of Commissioners by action of
the March 25, 2005 Annual Meeting.
3 Review
may require MVD's additional engineering review
for hydraulic verification or other matters
that may affect the system. This additional
charge will be the responsibility of the
developer or contractor. See Section 2.02.11
of the Town of Merrimack Zoning Ordinance
& Building Code - Aquifer Protection District
- A.
NOTE: PAYMENT
FOR MAINLINE EXTENSIONS AND RECORD DRAWINGS
(CASH/CERTIFIED CHECK) MUST BE RECIEVED PRIOR
TO CONSTRUCTION.
|
|
| top
of page |